Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Back to Police Projects

Leach Mounce Architects

Howard Leach
Principal in Charge

Shahram Moghbel
Project Architect & Project Designer

Judy Hoewisch
Interior Design

Fremont Police Facility
Fremont, California

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player


The design for the new 65,000 sq. ft. facility provides a carefully planned functional environ­ment support­ing Police Department operations and its future ex­pansion. It includes advanced computer and com­munications technology. At the same time, the de­sign supports the human needs of its staff and public users and aims to provide an artistic contribution to the urban de­sign of the Fremont Civic Center.

The facility is structurally enhanced significantly be­yond the requirements of the California Essential Services Act due to its proximity to the Hayward Fault. The building is designed so that each depart­ment can expand independently without disturbing any other department and without increasing the footprint of the building. The structure can accom­modate growth on terraces at each level up to a total building area of 85,000 s.f.

CONTACT:
City of Fremont, CA
Chief Craig T. Steckler
Fremont Police Department
2000 Stevenson
Fremont, CA 94538
510/790-6810

Project Completed:
October 1995

Budget:
$16,000,000

Final Cost:
$16,400,000